How We Work

Bulk Production

Garment manufacturing from approved samples and specifications, with material preparation, cutting, sewing, finishing, and quality control coordinated for your order.

Bulk Production
Introduction

About Bulk Production

Bulk production turns your approved design into a finished collection. YiFu coordinates the production specification, materials, size breakdown, and manufacturing schedule, with your approved sample as the reference for fit, construction, and finish.

From Approved Sample to Production

The pre-production sample brings the selected fabric, trims, measurements, and construction together before the order moves into manufacturing. Your approved specification then gives the production team a consistent reference for cutting, sewing, and finishing.

Production and Quality Control

Materials and work in progress are checked against the order requirements. Measurement, workmanship, labeling, and packing checks connect the finished garments to the approved sample. Your YiFu contact coordinates production updates and any changes that affect the order.

Timing Your Collection

Bulk production typically takes 2–4 weeks after all order details and approvals are confirmed. Shipping transit is additional. Material availability, approval dates, and your required shipment date are brought together in the production schedule.

Bulk Production

Bulk Production FAQs

When does bulk production begin?

Bulk production begins after all order details and approvals are complete, including the specifications, materials, quantities, size breakdown, approved sample, and agreed payment conditions.

Can I order mixed sizes?

Yes. Our typical MOQ is 200 pieces per style, per color, with mixed sizes. The size breakdown is included in your order confirmation.

Your Next Step

Discuss Your Order Requirements

Send Your Requirements

What to Send

Send the approved tech pack and sample reference; quantities by style, color and size; confirmed fabric, trims, labels and packing; your required shipment date; and any nominated inspection requirements.

All Capability Guides

Request received