How We Plan Womenswear Production Around Your Launch
Work back from warehouse intake and see when sampling, approvals, bulk production and delivery fit into a YiFu order.
Start with warehouse intake
Say your brand needs a dress drop ready for September. Share the latest warehouse receipt date, destination and delivery basis. We work backward through receiving, freight, factory handover, inspection and bulk production. The window between handover and warehouse intake depends on the shipment and transport plan.
Give development and production their own start dates
We typically make samples in 7–10 calendar days after style details, fabrics and trims are confirmed. Bulk production typically takes 2–4 weeks after all order details and approvals are confirmed. Give material sourcing, feedback, revisions, tests and transport their own time in your calendar. We confirm the style-specific schedule with you.
Put approvals on the critical path
For a two-color dress, the black fit sample may be approved while the berry lab dip still needs sign-off. We check the status of fit, grading, materials, labels and packing before confirming the approved scope for bulk. If a color or specification needs a second review, we can assess what this means for material availability or the handover date.
Track the key milestones
Agree the date for sample submission, when we need consolidated feedback, material approval, final specification, bulk start, inspection and handover. If a decision slips, we review the revised scope and discuss any feasible sequencing changes with you. Holidays, mill capacity and order volume can affect the plan.
Confirm replenishment as a new order
Share the approved sample reference, style and color quantities and your new delivery window. We recheck material availability, lot or shade consistency and the production schedule. Read about repeat orders and production planning or send your launch dates for a style-specific timeline.